December 4, 2009

We're moving right along... over the last two weeks work was completed on a second story wall (the tall concrete structure on the left in the picture below) along with installation of waterproofing and insulation materials and sanitary lines.
A view from atop the Knoll looking down on the building (the tall structure in the left-hand background is the elevator):

A view from the temporary parking area:

Our weekly overview of the site: